Foreman · Custom residential
Built from the ground up
Twenty-seven years on the tools and twenty-four custom homes carried from the first stake to the final walkthrough — framing, trades, and finish, all under one steady hand.
24
Homes delivered
27
Years as foreman
60+
Trades coordinated
100%
Inspections passed first time
01 — Selected builds
Four of twenty-four.
Every one delivered start to finish as foreman — schedule, trades, inspections, and the punch list closed before the keys changed hands.
2023Lake Meridian House
Lake Meridian, WA · 4,280 sq ft
Cedar-clad gables and a full glass wall facing the water. Built on a tight lot with a seasonal water table — the foundation package was redesigned twice before we broke ground.
2022Ridgeline Timber House
Cle Elum, WA · 3,650 sq ft
Exposed heavy timber trusses raised on a mountain site with a four-month snow window. Every truss was set and braced in a single dry week.
2021Stonecrest Residence
Yakima, WA · 5,100 sq ft
Stacked limestone and dark metal volumes stepped down a slope, with a 40-foot cantilevered terrace. Site access was a single-lane road shared with the neighbouring property.
2019Alder Street Craftsman
Wenatchee, WA · 2,900 sq ft
A 1912 craftsman brought back to its original porch and trim profile, with a full structural rebuild behind the original facade.
02 — Track record
A foreman is on the hook for the whole job.
I run the site. The schedule is mine, the trades are mine, and the inspection dates are mine. Builders bring me in before the first stake goes in the ground and hand over the keys after the last walkthrough.
Homeowners get one person who knows every inch of the house — what changed, why it changed, and what it cost before it happened.
Credentials & capability
- OSHA 30 · Fall protection
- Residential framing & structural steel
- Energy-code envelope detailing, blower-door tested
- Seismic & high-wind shear detailing
- Licensed general contractor, Washington
- 60+ trade partners on standing agreements
03 — How a build runs
Same sequence, every house.
01
Pre-construction
Drawing and spec review, trade scoping, three-week look-aheads, and a schedule the subs actually sign onto before anyone mobilizes.
02
Site & foundation
Layout, excavation coordination, footing and slab inspections, waterproofing. The part nobody photographs and everything depends on.
03
Framing & envelope
Structural framing, sheathing, windows, roofing, and air-sealing detailed to pass the blower door on the first attempt.
04
Finish & closeout
Trim, cabinets, hardware, final inspections, and a punch list closed before the family walks through the door.
04 — References
“He ran our Ridgeline build like a project manager twice his price. Every trade knew what was expected and when. We closed out eleven days early.”
Dana Whitcomb
Whitcomb & Sons Builders
“We were nervous first-time custom clients. He walked us through the framing twice, answered every text, and caught a window order mistake that would have cost us six weeks.”
The Alvarez Family
Homeowners, Stonecrest
05 — Start a project
Let's talk about your build.
Whether you're a builder scoping your next project or a family planning a custom home, the first conversation is the same: what you're building, where, and when.